English | Française | Pусский | 中文

Tel: +86-755-29652010
Fax:+86-755-29652015
Email: 
sales@ledpanellights.com
  info@ledpanellights.com

Send your inquiry

 > Home > LED Panel Light Installation > LED panel light suspended installation instruction

LED panel light suspended installation instruction

< back to LED Panel Light Installation

LED panel light suspended installation instruction


 

led panel light suspended installation

 

 

            LED Pane lights (TP-76-W-6012-G)              Accessories for suspended installation

 

led panel light suspended installation accessories

 

Accessories included below items:
1. Suspended cable:  4 pcs ;    
2. Connecting block:  4 pcs; 
3. Connecting bridge:  4 pcs ;   
4. White cap:  4 pcs;
5. Hoist clamp:  4 pcs;           
6. Screw-1:  8 pcs ;
7. Screw-2:  8 pcs; 

 

 

Installation steps:

 

STEP A-1
Mounting the Connecting bridge to the ceiling with Screw-1.
Total 4 pcs of Connecting bridges.

 

led panel light suspended installation

 


STEP A-2
Cover the connecting bridge with white cap.
Screw the Hoist Clamp to the Connecting Bridge through the hole of White Cap.

 

led panel light suspended installation

 

 

STEP A-3...

STEP B-1...

...

 

STEP C
Push the end of Suspended cable into the hole of Hoist clamp.
Notice, please considering the distance of the LED panel light to the ceiling , because the cable can't be pull out after push in, this is a unidirectional hoist clamp.

 

led panel light suspended installation

 

 

Finished picture

 

led panel light suspended installation

 

 

Please contact with our sales dept. for the completed installation manual.



Sitemap | Terms of use | Contact | LED Light Panel Copyright © 2010 All rights reserved. Shenzhen Theledlight Co., Ltd.